The McDonough project involved structural and mechanical scopes on two HRSGs and the steam turbine portion of a 2-on-1 combined-cycle configuration, including:

  • Erection of 700 tons of steel:

    • Air intake filter house steel for both gas turbine units

    • Platform and access steel for HRSGs, Centerline, and steam turbine areas

  • Assembling:

    • High-energy piping from HRSGs to steam turbine

    • Installation of over 53,000 LF of piping for the HRSGs, generator, and steam turbine systems

  • Centerline Installations:

    • (2) MHI 501G combustion turbines with steam cooling systems

    • (1) Toshiba 450 MW steam turbine (Unit 6)

  • Additional Work:

    • Installed four Nooter HRSGs (module and casing erection only) on Units 4 and 5.