Project – Cargill

+ View Photo Gallery

Cargill logo

Project: Air Separation

SPG replaced a contractor midway through an important job, due to quality issues, safety concerns, and the project being approximately a month behind schedule. With a critical deadline looming to have the facility in operation, SPG mobilized approximately 50 team members to this Indiana site within a week. Our manpower peaked at 70 working day and night.

SPG expedited our scope and got the project back on schedule and exceeded Cargill’s expectations.

Our Scope Included:

  • Fabrication and Erection of large steel structural elements and conveying solutions
  • Large concrete foundations
  • Extensive steel structural erection

Equipment Installed Included:

  • Multiple bucket elevators, belt conveyors, reclaim conveyors, ceramic lined chutes and transitions custom fabricated on site
  • 3 truck unloading buildings; concrete foundations and area paving
  • Air piping and sample lines with lifts planned and executed by SPG included high lifts of over 100,000 pounds each